Skip to main content
The three-arched granite Staines Bridge across the River Thames

Staines-upon-Thames, Surrey

Commercial Exterior Cleaning in Staines-upon-Thames

Exterior cleaning for offices, riverside premises, retail units and managed buildings in Staines-upon-Thames, where the Colne meets the Thames, close to Heathrow.

We aim to reply to every survey request within one hour, 8am to 6pm, Monday to Saturday.

The areaStaines-upon-Thames: Staines Bridge over the Thames · Photo: Mark Percy, CC BY-SA 2.0 · Image credits

Free survey
within five working days
Reply within one hour
we aim to, 8am to 6pm, Monday to Saturday
5-star rating
on Google
DBS-checked
IPAF-accredited Chiltern Surface Co technicians
£5m
public liability insurance

Included on the project

  • Drone survey of roofs and high-level areaswhere needed
  • Fixed-price proposalspecification of works, programme and exclusions
  • Site-specific RAMS issued before mobilisation
  • Powered accessoperated by IPAF-accredited Chiltern Surface Co technicians
  • Completion reportbefore-and-after photography and defect schedule
  • £5 million public liability cover

We aim to reply to every survey request within one hour, 8am to 6pm, Monday to Saturday.

The town

Offices, the riverside and the old brick streets

Staines-upon-Thames is about 23 miles from Marlow, by the M4 and the M25, or along the river through Windsor. It's close to Heathrow, and the work here is offices, riverside pubs and restaurants, shops and managed blocks.

The offices
The High Street, Bridge Street and London Road have a lot of glazed and clad office blocks with canopies and car parks. We keep staff entrances open and move from zone to zone.
The conservation area
The old streets are mostly red or buff brick or render, under slate or tile roofs, with tile hanging on Church Street. We look at each front on its own and agree a test area first.
The riverside
Walls facing the Thames stay damp and shaded, so they pick up algae and green growth. Next to the river, we plan exactly where the wash water goes and write it into the RAMS before we start.
What we see most
A grey film on façades and glass from the A30, A308 and M25, and run-off marks from roof drainage on brick and render.
Around Staines-upon-Thames
Egham, Egham Hythe, Laleham, Ashford, Stanwell, Shepperton and Sunbury in Surrey. Wraysbury and Datchet, just over the border in Berkshire, too.

How it works

How it works

  1. 01Free site surveyWe visit within five working days, photograph every surface and survey roofs by drone where needed.
  2. 02Fixed-price proposalWhat we'll do, when, and what's excluded. No day rates.
  3. 03PlanningSite-specific RAMS issued. We check the asbestos register, drainage drawings and site rules before we start.
  4. 04The workZone by zone behind barriers. Debris removed and wash water controlled.
  5. 05Completion reportBefore-and-after photos, any defects we found, and sign-off.
  6. 06Planned maintenanceAn optional schedule so the site stays clean.

We aim to reply to every survey request within one hour, 8am to 6pm, Monday to Saturday.

The area

Offices on the High Street

A four-storey brick and glass office building on the High Street, Staines-upon-Thames
Figure 01Staines-upon-Thames: brick and glass offices on the High Street · Photo: David Howard, CC BY-SA 2.0 · Image credits

Safety and site control

Planned before we arrive

Roofs
We identify the roof covering before any work is proposed and request the asbestos register. Asbestos-cement and fragile roofs are never pressure-washed or walked on.
Wash water
We plan wash-water control and drain protection for every site.
Listed and conservation buildings
We use test areas and low-pressure methods on listed and conservation-area buildings.
Schools and care settings
We work in school holidays and INSET days, or behind exclusion zones away from pupils and residents.

Questions

Common questions

Can riverside premises be cleaned without wash water reaching the Thames?

Yes. Wash-water control and drain protection are planned at the survey, and beside the river the working area and run-off controls are written into the RAMS before work begins.

Can an office stay open during the works?

Yes. We work one zone at a time behind cordons, with out-of-hours working where staff access to entrances and car parks cannot be interrupted.

Do you work on listed buildings in the conservation area?

Yes. Brick, render and tile hanging are recorded front by front, and a test area settles the method before the rest is cleaned.

Do you cover Egham, Ashford and Shepperton?

Yes, along with Laleham, Stanwell and Sunbury. The site survey is free, and we visit within five working days.

What should I include in the request?

The address, the property type, the surfaces involved, any access or parking limits and timing. We will need the asbestos register and drainage drawings before any roof or gutter work.

Next step

Request a Site Survey

Tell us where the Staines-upon-Thames property is and which surfaces concern you. We look at the site first, and only then price the work.

We aim to reply to every survey request within one hour, 8am to 6pm, Monday to Saturday.