Skip to main content
Reading Bridge crossing the River Thames at Reading

Reading, Berkshire

Commercial Exterior Cleaning in Reading

Exterior cleaning for warehouses, industrial units, business parks and managed commercial properties across Reading and the surrounding parts of Berkshire.

We aim to reply to every survey request within one hour, 8am to 6pm, Monday to Saturday.

The areaReading: Reading Bridge over the River Thames · Photo: Ben Sutherland from Forest Hill, London, European Union, CC BY 2.0 · Image credits

Free survey
within five working days
Reply within one hour
we aim to, 8am to 6pm, Monday to Saturday
5-star rating
on Google
DBS-checked
IPAF-accredited Chiltern Surface Co technicians
£5m
public liability insurance

What we do

Services across Reading

Included on the project

  • Drone survey of roofs and high-level areaswhere needed
  • Fixed-price proposalspecification of works, programme and exclusions
  • Site-specific RAMS issued before mobilisation
  • Powered accessoperated by IPAF-accredited Chiltern Surface Co technicians
  • Completion reportbefore-and-after photography and defect schedule
  • £5 million public liability cover

We aim to reply to every survey request within one hour, 8am to 6pm, Monday to Saturday.

The town

M4 distribution sites, business parks and the historic centre

Reading has a broad mix of distribution, industrial, office, retail and managed commercial property, including sites around the A33 corridor, Junction 11 of the M4 and other employment areas. These properties differ in scale, construction and daily use, so a busy warehouse yard needs different priorities from an office entrance or a customer-facing forecourt. Chiltern Surface Co is based in Marlow, Buckinghamshire, north-east of Reading and further down the Thames.

M4 and A33 distribution sites
Warehouses and distribution properties near the M4 and the A33 have active loading bays, HGV routes, parked trailers, security controls and limited windows for exterior work. The survey records priority elevations, service routes, drainage points and the busiest times of day, so the specification of works follows the way the site operates.
Business parks
Green Park, by Junction 11, has office buildings set around a lake. Suttons Business Park, in Earley, is made up largely of light industrial and warehouse units. Business estates combine reception areas, visitor parking, paths and landscaped boundaries shared with neighbouring occupiers, so the works are phased zone by zone behind agreed exclusion areas, and access to shared routes can be maintained wherever the site conditions allow.
Town centre
The Market Place/London Street conservation area is one of 15 in Reading. Its Victorian banks are built in natural stone; listed buildings and modest commercial premises stand beside them, many in the red, blue and buff brick of the town's own brickworks.
Local conditions
Vehicle traffic, loading activity, atmospheric deposits, shaded elevations and roof drainage all affect how a commercial exterior weathers. Tyre marks and grime build up on hard surfaces, while coated panels show water trails, algae and dirt beneath roof edges.
Around Reading
Earley, Lower Earley, Woodley, Winnersh, Theale, Tilehurst, Caversham and the surrounding parts of Berkshire.

How it works

How it works

  1. 01Free site surveyWe visit within five working days, photograph every surface and survey roofs by drone where needed.
  2. 02Fixed-price proposalWhat we'll do, when, and what's excluded. No day rates.
  3. 03PlanningSite-specific RAMS issued. We check the asbestos register, drainage drawings and site rules before we start.
  4. 04The workZone by zone behind barriers. Debris removed and wash water controlled.
  5. 05Completion reportBefore-and-after photos, any defects we found, and sign-off.
  6. 06Planned maintenanceAn optional schedule so the site stays clean.

We aim to reply to every survey request within one hour, 8am to 6pm, Monday to Saturday.

Photographic record

Survey, phased works and the completion report

Low-angle view of a roof pitch with moss and leaves across the corrugated sheeting
Figure 01Drone survey: moss and leaves across a roof pitch in Reading
Oblique view along a roof eave with moss and leaf litter against the gutter, trees beyond
Figure 02Drone survey: moss and leaf litter along an eave in Reading
Low oblique view down a roof pitch with moss and leaf litter packed into the troughs
Figure 03Drone survey: moss and leaf litter packed into the troughs in Reading
Close oblique view of a flat roof edge with stained membrane beside green wall cladding
Drone survey: stained membrane at a flat roof edge beside green wall cladding

Safety and site control

Planned before we arrive

Roofs
We identify the roof covering before any work is proposed and request the asbestos register. Asbestos-cement and fragile roofs are never pressure-washed or walked on.
Wash water
We plan wash-water control and drain protection for every site.
Listed and conservation buildings
We use test areas and low-pressure methods on listed and conservation-area buildings.

Questions

Common questions

Can warehouse cladding and yards be cleaned together?

Yes, where the surfaces and access are suitable. One survey covers the elevations, gutters and the ground below, and the specification of works sets a top-down sequence around doors, loading bays and yards.

Can the work be planned around deliveries and loading?

Yes. Works are phased zone by zone behind agreed exclusion areas, around loading schedules, dock positions and vehicle routes, so access can be maintained wherever the site conditions allow. Out-of-hours working is available.

Is pressure washing suitable for every industrial surface?

No. It suits robust concrete and paving, but weak joints, weathered coatings and sensitive cladding need another approach. The survey decides whether pressure is appropriate.

What do you send after the survey?

A fixed-price proposal with a specification of works, programme and exclusions, and no day rates or overrun charges. After the works, a completion report with before-and-after photography, a defect schedule and a PPM proposal.

What information should I provide?

The full address or postcode, the property type, the surfaces involved, photographs if you have them, access restrictions and your preferred timeframe. For roof or gutter work, also the site's asbestos register and drainage drawings.

Next step

Request a Site Survey

Tell us about the Reading property, the exterior areas that need attention and the result you want to achieve. We survey the site, then send a fixed-price proposal.

We aim to reply to every survey request within one hour, 8am to 6pm, Monday to Saturday.