
Slough, Berkshire
Commercial Exterior Cleaning Slough
In Slough, our commercial exterior cleaning centres on façades and cladding for offices, warehouses, industrial units and managed commercial properties.
We aim to reply to every survey request within one hour, 8am to 6pm, Monday to Saturday.
Drone survey: corrugated roof sheeting, rooflight strips and valley gutters in Slough
- Free survey
- within five working days
- Reply within one hour
- we aim to, 8am to 6pm, Monday to Saturday
- 5-star rating
- on Google
- DBS-checked
- IPAF-accredited Chiltern Surface Co technicians
- £5m
- public liability insurance
What we do
From Bath Road frontages to estate yards
- Façade cleaningEntrance elevations, canopies and signage surrounds on offices around the station and along Bath Road.
- Cladding cleaningCoated metal and composite panels on Trading Estate and Poyle warehouses and industrial units, and on modern offices.
- Render and masonry cleaningRendered and painted elevations with green, red or black organic marking; render is soft-washed.
- Brick and stonework cleaningOlder brick and masonry, including buildings in the conservation areas.
- Roof cleaningRoofs where moss, algae and lichen contribute to runoff marks on the elevations below.
- Gutter and high-level cleaningGutters and outlets cleared where overflow stains roof edges and the walls below; debris is removed before flushing.
- High-level access cleaningUpper façades, cladding and rooflines, reached from powered access.
- Industrial yard and warehouse cleaningService yards, loading bays and HGV routes on the estates, organised around deliveries and the areas that must stay available.
- Pressure washingControlled pressure washing for robust paths, forecourts and service areas, where the surface supports it.
Included on the project
- Drone survey of roofs and high-level areaswhere needed
- Fixed-price proposalspecification of works, programme and exclusions
- Site-specific RAMS issued before mobilisation
- Powered accessoperated by IPAF-accredited Chiltern Surface Co technicians
- Completion reportbefore-and-after photography and defect schedule
- £5 million public liability cover
- Office
- 01628 232 450
- Mobile
- 07308 755 755WhatsApp
We aim to reply to every survey request within one hour, 8am to 6pm, Monday to Saturday.
The town
The Trading Estate, the town centre and the Heathrow edge
Slough lies in east Berkshire, on the M4. The town has a concentrated mix of offices, warehouses, industrial units, trade premises, retail sites and managed commercial estates, varying considerably in age, scale and construction.
- Slough Trading Estate
- West of the town centre, the estate mixes factories, warehouses and offices. Its larger sites can have long elevations, active loading bays, HGV routes, security controls and limited windows for exterior work, so the survey identifies priority façades, service routes, drainage points and times of highest activity.
- Town centre and Bath Road
- Offices around the station and along the A4 combine prominent entrance elevations with visitor parking, paths and shared access. The work is divided between presentation-led frontages and supporting elevations.
- Colnbrook and Poyle
- Beside Heathrow, the logistics warehouses and yards of Poyle Industrial Estate run on delivery schedules. This close to the airport, airspace restrictions can rule out a drone survey of the roof.
- Conservation areas
- Colnbrook, Upton Park and Upton Village, and St Mary's Church in Langley are conservation areas; weathered older frontages there are covered by façade restoration.
- Weathering
- Traffic exposure, loading activity, atmospheric deposits, shade and roof drainage all influence how façades weather. Coated panels collect water trails and general grime; render and masonry develop algae, organic marking or localised staining.
- Managed estates
- A requirement may be one building, a mixed-use development or several managed properties, each surveyed on its own materials, access and operating conditions. Portfolios under one contact and one standard sit with multi-site and portfolio contracts.
- Bath Road to Poyle
- Commercial building cleaning in Slough ranges from offices on Bath Road to industrial exterior cleaning across the Trading Estate, Colnbrook and Poyle. Large commercial buildings are surveyed in sections, so a long elevation or a big roof can be phased.
- Around Slough
- Langley and Cippenham within the borough; Burnham, Farnham Common and Stoke Poges in Buckinghamshire; Datchet in Berkshire.
Safety and site control
Planned before we arrive
- Roofs
- We identify the roof covering before any work is proposed and request the asbestos register. Asbestos-cement and fragile roofs are never pressure-washed or walked on.
- Wash water
- We plan wash-water control and drain protection for every site.
- Listed and conservation buildings
- We use test areas and low-pressure methods on listed and conservation-area buildings.
- Office
- 01628 232 450
- Mobile
- 07308 755 755WhatsApp
We aim to reply to every survey request within one hour, 8am to 6pm, Monday to Saturday.
How it works
How it works
- 01
Free site survey
Within five working days we visit, record each surface and, where airspace permits, fly the roofs by drone. Access planning covers HGV routes and shift patterns on the estates, and footways on Bath Road; safety controls and drainage are recorded for each building, then agreed with the facilities management lead. - 02
Fixed-price proposal
What we'll do, when, and what's excluded. No day rates. - 03
Planning
Site-specific RAMS issued. We check the asbestos register, drainage drawings and site rules before we start. - 04
The work
Zone by zone behind barriers. Debris removed and wash water controlled. - 05
Completion report
Completion report: before-and-after photography of each elevation, roof and yard, a defect schedule, and sign-off at handover. - 06
Planned maintenance
The report records the method used on each surface and how long elevations were phased in sections. An optional PPM schedule sets the ongoing maintenance and scope, and managed property cleaning across a trading estate can follow one programme.
Photographic record
Works at height, phased works and handover




What we do
What we specify for the site
Nothing in Slough is priced from a standard list: the specification of works records what the survey found and what will be done.
| Areas | Offices on Bath Road, units across the Trading Estate, Colnbrook and Poyle, trade premises and managed commercial estates. |
|---|---|
| Method | The survey sets the method surface by surface: gentle soft washing for render and coated cladding, controlled pressure only where the material takes it. Work is phased zone by zone behind barriers, and out-of-hours working is available. |
| Ongoing | A one-off project suits a handover, inspection or reopening. Sites where dirt keeps returning move onto planned preventative maintenance (PPM), with the interval set by what the completion report shows. |
Questions
Questions from site managers
Can the work be planned around an operating site?
Yes. Works are phased zone by zone behind agreed exclusion areas, so staff, customers, deliveries and neighbouring occupiers keep their access wherever the site conditions allow. Chiltern Surface Co offers out-of-hours working where a Slough site needs it, on the Trading Estate or in the town centre.
Can façades, cladding, roofs and gutters be cleaned in one project?
Yes, where the surfaces, access and site arrangements suit it. One survey covers them, one fixed-price proposal from Chiltern Surface Co specifies each surface, and higher-level work generally comes first, so cleaned façades and cladding on the Slough building are not marked from above.
Can every stain be completely removed?
No. The achievable result depends on how deep the staining sits within the substrate and what caused it. Where complete removal cannot be guaranteed on a Slough building, Chiltern Surface Co identifies this before works begin and sets out the expected improvement clearly.
What do you send after the survey?
A fixed-price proposal from Chiltern Surface Co with a specification of works, programme and exclusions, with no day rates and no overrun charges. When the Slough work is done you receive a completion report with before-and-after photography, a defect schedule and a PPM proposal.
What information should I provide?
The full address or postcode, the property type, the elevations involved, photographs if you have them, access restrictions and your preferred timeframe. For roof or gutter work Chiltern Surface Co also asks for the asbestos register and drainage drawings for the Slough site.
Next step
Request a Site Survey
Tell us about the Slough property, the elevations that need attention and the result you want to achieve. We survey the site, then send a fixed-price proposal with a specification of works, programme and exclusions.
We aim to reply to every survey request within one hour, 8am to 6pm, Monday to Saturday.
- Office
- 01628 232 450
- Mobile
- 07308 755 755WhatsApp
Related
