Skip to main content
A brick school building with long gutter runs, a covered walkway and an empty playground.

Schools and colleges

Bucks · Oxon · Berks · Herts · Surrey

Exterior Cleaning For Education

School and college buildings, playgrounds, paths and entrances are used every day, so exterior cleaning for education sites is planned around the academic calendar across Buckinghamshire, Oxfordshire, Berkshire, Hertfordshire and Surrey.

We aim to reply to every survey request within one hour, 8am to 6pm, Monday to Saturday.

Free survey
within five working days
Reply within one hour
we aim to, 8am to 6pm, Monday to Saturday
5-star rating
on Google
DBS-checked
IPAF-accredited Chiltern Surface Co technicians
£5m
public liability insurance

What we do

One specification across the site's surfaces

A specification of works can cover a single playground or bring roofs, gutters, elevations and hard surfaces across several buildings together. We walk the relevant parts of the site before we price the work and separate the surfaces that genuinely need cleaning from those that can be left alone. If an area does not need cleaning, we do not add it to make the job larger.

  • Leaves and moss being cleared from a gutter on a brick building with a gutter vacuum pole from the ground.

    Service

    Gutter and high-level cleaning

    Gutters and outlets cleared of leaves, moss and debris, then flushed. Tree-lined sites see regular autumn and winter build-up. Clearance can be a standalone visit or combined with other exterior work.

  • Technician side-on with a surface cleaner on a foamed patch of paving, a van and stanchion cordon in front of a stone-built hotel

    Service

    Car park and walkway cleaning

    Main entrances, pedestrian paths, covered approaches and communal walkways where footfall is heaviest, and car parks.

  • Drone survey view of a moss-darkened corrugated fibre-cement industrial roof with patched rooflights and flue stacks

    Service

    Roof cleaning

    Moss and organic growth on roofs, particularly on buildings surrounded by mature trees.

  • A Chiltern Surface Co technician cleaning a hotel forecourt with a surface cleaner, the company van parked by the entrance steps.

    Service

    Planned preventative maintenance (PPM)

    Gutters beneath trees may need frequent attention while a rendered elevation may stay presentable for several years, so where it is justified, the PPM proposal suggests a review cycle for each area rather than cleaning everything every year.

All services

Included on the project

  • Drone survey of roofs and high-level areaswhere needed
  • Fixed-price proposalspecification of works, programme and exclusions
  • Site-specific RAMS issued before mobilisation
  • Powered accessoperated by IPAF-accredited Chiltern Surface Co technicians
  • Completion reportbefore-and-after photography and defect schedule
  • £5 million public liability cover

We aim to reply to every survey request within one hour, 8am to 6pm, Monday to Saturday.

The problem

Exterior condition on an occupied school site

Primary and secondary schools, academies, independent schools and colleges carry constant footfall alongside the normal effects of weather, trees, traffic and biological growth. Render turns green, entrances darken and paths collect organic growth so gradually that the decline is easy to overlook, until it becomes the first impression of the site for pupils, students, staff and visitors.

The work has to fit around the school day. A project that is straightforward in the holidays can be far more disruptive on a normal teaching day, particularly where water, equipment or temporary restrictions sit across a route pupils use. Chiltern Surface Co takes responsibility for the survey, specification, mobilisation, delivery and handover, so the site or estates manager has a problem to hand over rather than another contractor to supervise. Every Chiltern Surface Co technician is DBS-checked, and on planned maintenance at least one of the same crew attends every visit.

Roof, gutter and playground work is explained in more detail under commercial gutter cleaning and commercial pressure washing.

Predictable peaks
Entrances become busy at predictable times: vehicle and pedestrian movement changes sharply at drop-off and collection, and paths fill at class changes. A main entrance may need cleaning outside its busiest period, and a secondary route may give better access at certain times.
A fixed working window
The school year fixes when most work can happen, and a large playground is easier to address with no pupils on site. Where the work will not fit one holiday or closure period, it is prioritised so the most visible or affected areas are dealt with first.
Mixed building stock
Older brick teaching blocks can sit alongside newer rendered or clad buildings, workshops, sports facilities, courtyards and car parks. A paved playground and a rendered elevation may be only metres apart, but they are not cleaned in the same way, so each surface is specified on its own material and condition.
Mature trees
Leaves fill gutters, shaded paths stay damp for longer, and organic growth takes hold more readily on some walls and paving. Where vegetation is a major factor, the survey records it, which helps estates teams see why one part of a site deteriorates faster than another.
Playgrounds
Intensive daily use, weather, surrounding trees and organic material gradually leave hard surfaces looking dark or uneven.
Whole-site view
Commercial building cleaning for a school covers the main block, sports hall and entrances in one survey. Industrial exterior cleaning of a service yard or plant area is added only where the site has one, so the commercial buildings on a campus are specified together.

Safety and site control

Planned before we arrive

Roofs
We identify the roof covering before any work is proposed and request the asbestos register. Asbestos-cement and fragile roofs are never pressure-washed or walked on.
Wash water
We plan wash-water control and drain protection for every site.
Listed and conservation buildings
We use test areas and low-pressure methods on listed and conservation-area buildings.
Schools and care settings
We work in school holidays and INSET days, or behind exclusion zones away from pupils and residents.

We aim to reply to every survey request within one hour, 8am to 6pm, Monday to Saturday.

How it works

How it works

  1. 01

    Free site survey

    Site visit and, where airspace permits, a drone survey of roofs and high-level areas, with the condition photographed. Access planning fits the school day and the holidays; safety controls for pupils' routes and the drainage from roofs and playgrounds are recorded, then agreed with the facilities management lead or site manager.
  2. 02

    Fixed-price proposal

    What we'll do, when, and what's excluded. No day rates.
  3. 03

    Planning

    Site-specific RAMS issued. We check the asbestos register, drainage drawings and site rules before we start.
  4. 04

    The work

    Zone by zone behind barriers. Debris removed and wash water controlled.
  5. 05

    Completion report

    Completion report: before-and-after photography of each building and play area, a defect schedule, and sign-off for the school's records.
  6. 06

    Planned maintenance

    The report records the method used on each surface and how the zones were phased around term dates. Trusts and colleges that want managed property cleaning across several sites can add an optional PPM schedule, which sets the ongoing maintenance and scope for each visit.

Photographic record

Phased works and the completion report

Low-angle close view of a moss and algae-stained white gutter, bracket and downpipe junction on a brick building in clear weather
Figure 01Survey: algae-stained gutter and downpipe junction on a brick building
Low-angle diagonal view of a stained, mossy gutter and fascia on a brick building in clear weather
Figure 02Survey: stained gutter and fascia on a brick building
A white fascia panel running along a brick wall below a flat roof, with trees to the right.
Survey: a white fascia along a brick wall below a flat roof

Questions

Schools and colleges FAQs

Can you work during school holidays and INSET days?

Yes. Holidays, half-terms and INSET days are the usual windows, and weekend and out-of-hours working is available. Smaller areas can be completed in term time behind exclusion zones away from pupils, depending on access and the work. Chiltern Surface Co agrees the timing at the survey.

What exterior areas can you include at a school or college?

Roofs, gutters, rendered, brick and clad elevations, entrances, paths, playgrounds, courtyards, car parks and other suitable hard surfaces. Chiltern Surface Co's survey confirms which areas genuinely need attention, and the specification of works names each one with its method and any exclusions.

Do you clean school playgrounds?

Yes. Hard-surface playgrounds are cleaned once the surface construction, painted markings, specialised finishes and adjacent equipment have been identified at the survey, before any equipment is brought onto the area. Chiltern Surface Co times playground work for holidays or INSET days, behind exclusion zones.

Can roof and gutter work be combined with other exterior work?

Yes. Roofs, gutters, elevations and hard surfaces can be surveyed on the same visit and specified together in one fixed-price proposal. Bringing them into one survey gives the estates team a clearer view of the work needed, and Chiltern Surface Co sequences roof work first.

Can you work across several schools in an academy trust?

Yes, where the schools are in Buckinghamshire, Oxfordshire, Berkshire, Hertfordshire or Surrey. Each school is surveyed and specified on its own condition, because a newer academy building may not need the same work as an older school. Chiltern Surface Co gives the trust one contact, one standard and consolidated reporting across the sites.

What do we receive when the work is complete?

A completion report from Chiltern Surface Co: the works completed against the specification, before-and-after photography, a defect schedule, any items outside the specification that need your attention, and sign-off. Where the site justifies it, the report ends with a planned preventative maintenance (PPM) proposal and a suggested review cycle for each area.

Next step

Request a Site Survey

Tell us which parts of the school or college need attention, and your term dates and closure periods. We survey the relevant areas, then send a fixed-price proposal with a specification of works, programme and exclusions.

We aim to reply to every survey request within one hour, 8am to 6pm, Monday to Saturday.

Related

Where school and college work connects