Skip to main content
All Saints' Church and the lock mooring on the River Thames at Marlow

Marlow, Buckinghamshire

Commercial Exterior Cleaning Marlow

Georgian frontages on the High Street, business parks on the approaches and the villages beyond: our commercial exterior cleaning around Marlow covers shops, offices, managed properties and operational sites.

We aim to reply to every survey request within one hour, 8am to 6pm, Monday to Saturday.

The areaMarlow: All Saints' Church and the River Thames · Photo: David Hawgood, CC BY-SA 2.0 · Image credits

Free survey
within five working days
Reply within one hour
we aim to, 8am to 6pm, Monday to Saturday
5-star rating
on Google
DBS-checked
IPAF-accredited Chiltern Surface Co technicians
£5m
public liability insurance

Included on the project

  • Drone survey of roofs and high-level areaswhere needed
  • Fixed-price proposalspecification of works, programme and exclusions
  • Site-specific RAMS issued before mobilisation
  • Powered accessoperated by IPAF-accredited Chiltern Surface Co technicians
  • Completion reportbefore-and-after photography and defect schedule
  • £5 million public liability cover

We aim to reply to every survey request within one hour, 8am to 6pm, Monday to Saturday.

The town

Historic frontages in the centre, modern sites on the approaches

Marlow's commercial property runs from prominent town-centre premises, shops, restaurants and hotels to offices, schools, care settings, managed residential developments and business sites on the approaches to the town. These buildings differ in age, scale and construction, and a busy customer entrance needs different priorities from a roof, a service area or a less visible rear elevation.

Town centre
The High Street, West Street and the streets around them lie within the Marlow conservation area, and many of their buildings are listed, in Georgian or older vernacular styles. Premises here have active frontages, public footways, neighbouring businesses and limited working space, so the survey records entrances, signage, pedestrian routes and the busiest times of day.
Business sites
Away from the centre, sites such as Globe Business Park on Fieldhouse Lane mix offices with industrial and warehouse units. They bring modern elevations, coated cladding, staff entrances, car parks, service yards and delivery routes, and the work is divided between customer-facing areas, building fabric and operational zones.
Local conditions
Traffic leaves grime on façades and roadside boundaries. Shade and nearby vegetation, common on the riverside and wooded sites around the town, encourage algae and other organic growth. Roof drainage creates recurring runoff marks, and busy forecourts and access routes collect dirt through daily use.
Managed property
An enquiry may cover one building, a mixed-use development or several managed properties. Each property is surveyed and specified on its own; several sites under one contact and one standard are covered by multi-site and portfolio contracts.
What the survey covers
Commercial building cleaning in Marlow runs from town-centre premises to business sites on the approaches. Industrial exterior cleaning of yards and units is priced alongside it, so the commercial buildings on one site, or several, share a single survey.
Around Marlow
We also cover Bisham, Little Marlow, Marlow Bottom, Medmenham, Bourne End, Cookham and the surrounding parts of Buckinghamshire and Berkshire.

Safety and site control

Planned before we arrive

Roofs
We identify the roof covering before any work is proposed and request the asbestos register. Asbestos-cement and fragile roofs are never pressure-washed or walked on.
Wash water
We plan wash-water control and drain protection for every site.
Listed and conservation buildings
We use test areas and low-pressure methods on listed and conservation-area buildings.
Schools and care settings
We work in school holidays and INSET days, or behind exclusion zones away from pupils and residents.

We aim to reply to every survey request within one hour, 8am to 6pm, Monday to Saturday.

How it works

How it works

  1. 01

    Free site survey

    The survey takes place within five working days, and roofs are flown by drone where airspace permits. Access planning for town-centre frontages covers footways, deliveries and trading hours; safety controls and the way rainwater drains from roofs and forecourts are recorded, then agreed with the facilities management contact.
  2. 02

    Fixed-price proposal

    What we'll do, when, and what's excluded. No day rates.
  3. 03

    Planning

    Site-specific RAMS issued. We check the asbestos register, drainage drawings and site rules before we start.
  4. 04

    The work

    Zone by zone behind barriers. Debris removed and wash water controlled.
  5. 05

    Completion report

    Completion report: before-and-after photography of each frontage and yard, a defect schedule, and sign-off at handover.
  6. 06

    Planned maintenance

    The report notes the method used on each surface and how the zones were phased around trading. Managed property cleaning across several Marlow sites can follow one optional PPM schedule, which sets the ongoing maintenance and scope for each visit.

Photographic record

Surveyed before pricing, recorded at handover

Aerial view of a large dark tiled roof with two chimney stacks, conifer needles and moss debris along the flashings
Figure 01Survey: dark tiled roof with chimney stacks, needle debris and moss
Aerial view of a parapet box gutter with a stained membrane beside a profiled-metal roof
Figure 02Drone survey: a parapet box gutter and stained membrane
Overexposed aerial view of a roof corner with an outlet and a rust stain
Figure 03Drone survey: a roof corner with an outlet and a rust stain
A tiled roof slope with rooflights above a garage, with trees overhanging it.
Survey: a tiled roof slope with rooflights above a garage, under overhanging trees

What we do

What the specification covers

Nothing in Marlow is priced from a standard list: the specification of works records what the survey found and what will be done.

AreasTown-centre frontages, restaurant and hotel entrances, offices, school and care-setting grounds, managed residential blocks and business sites on the approaches to Marlow.
MethodThe survey sets the method surface by surface: gentle soft washing for render and coated cladding, controlled pressure only where the material takes it. Work is phased zone by zone behind barriers, and out-of-hours working is available.
OngoingA one-off project suits a handover, inspection or reopening. Sites where dirt keeps returning move onto planned preventative maintenance (PPM), with the interval set by what the completion report shows.

Questions

Questions we are asked

What types of commercial property can you take on in Marlow?

Shops, restaurants and hotels, offices, industrial and warehouse units, managed developments, schools and care settings, in the town centre or on the business sites. Chiltern Surface Co works across Marlow, and each property is surveyed before it is priced.

Can you work on the listed frontages on the High Street and West Street?

Yes. Chiltern Surface Co's survey records each elevation's material and condition on Marlow's High Street and West Street, and the specification of works sets out the method for each one, starting from a test area and low-pressure methods on listed and conservation-area buildings.

Can a High Street shop or restaurant keep trading during the works?

Yes. Works are phased zone by zone behind agreed exclusion areas, so access can be maintained wherever the site conditions allow, and out-of-hours working is available. In Marlow town centre, Chiltern Surface Co can time frontage work before trading starts or after closing on the busiest days.

What do you send after the survey?

A fixed-price proposal for the Marlow site, with a specification of works, programme and exclusions. There are no day rates and no overrun charges. When the work is done, Chiltern Surface Co sends a completion report with before-and-after photography, a defect schedule and a PPM proposal.

What information should I provide?

The full address, the property type, the surfaces involved, photographs if you have them, any access restrictions and your preferred timeframe. For roof or gutter work Chiltern Surface Co also asks for the asbestos register and drainage drawings, and surveys Marlow sites within five working days.

Next step

Request a Site Survey

Tell us about the Marlow property, the surfaces that need attention and what you need to achieve. We survey the site, then send a fixed-price proposal with a specification of works, programme and exclusions.

We aim to reply to every survey request within one hour, 8am to 6pm, Monday to Saturday.