Skip to main content
Aerial panorama of the city of Oxford and its spires

Oxford, Oxfordshire

Commercial Exterior Cleaning Oxford

Listed frontages in the historic centre give way to business parks and industrial estates around it. Commercial exterior cleaning in Oxford covers offices, managed properties and operational sites in both.

We aim to reply to every survey request within one hour, 8am to 6pm, Monday to Saturday.

The areaOxford: the city skyline from above · Photo: Chensiyuan, CC BY-SA 4.0 · Image credits

Free survey
within five working days
Reply within one hour
we aim to, 8am to 6pm, Monday to Saturday
5-star rating
on Google
DBS-checked
IPAF-accredited Chiltern Surface Co technicians
£5m
public liability insurance

Included on the project

  • Drone survey of roofs and high-level areaswhere needed
  • Fixed-price proposalspecification of works, programme and exclusions
  • Site-specific RAMS issued before mobilisation
  • Powered accessoperated by IPAF-accredited Chiltern Surface Co technicians
  • Completion reportbefore-and-after photography and defect schedule
  • £5 million public liability cover

We aim to reply to every survey request within one hour, 8am to 6pm, Monday to Saturday.

The city

Listed buildings in the centre, working sites around it

Oxford's historic core is a conservation area and a regional commercial centre, and many of its buildings are listed. Across the city, commercial property runs from offices, shops, hotels and restaurants to schools, care settings, managed residential developments, business parks and industrial premises.

The historic centre
The commercial core of the central conservation area takes in the High Street, Cornmarket, Queen Street, Broad Street and the streets around them. Its seventeenth- and eighteenth-century town houses are often timber-framed behind painted render; its nineteenth- and twentieth-century shop buildings are typically pale brick or Headington or Clipsham stone ashlar.
Access in the centre
Premises have active frontages, public footways, neighbouring buildings and limited working space. Cornmarket Street is pedestrianised, only buses may use Queen Street by day, and a zero emission zone charges petrol, diesel and hybrid vehicles on several central streets. The survey records entrances, footways, where vehicles can stand and the busiest times of day.
Business and industrial sites
Away from the centre, business parks such as Oxford Business Park in Cowley and those on Langford Lane, Kidlington, and industrial estates such as Osney Mead off Botley Road bring larger elevations, where loading bays, parked vehicles, landscaping and changes in ground level shape the access.
Managed property
Where a managing agent or estates team holds several Oxford properties, each is surveyed and specified on its own, under one contact and one standard: see multi-site and portfolio contracts.
Centre to estates
Commercial building cleaning in Oxford covers historic-centre offices and shops, with industrial exterior cleaning on the business and industrial sites around the city. The commercial buildings on one site are surveyed together, centre or estate.
Around Oxford
Headington, Cowley, Botley, Summertown, Kidlington, Wheatley, Abingdon and the surrounding parts of Oxfordshire.

Safety and site control

Planned before we arrive

Roofs
We identify the roof covering before any work is proposed and request the asbestos register. Asbestos-cement and fragile roofs are never pressure-washed or walked on.
Wash water
We plan wash-water control and drain protection for every site.
Listed and conservation buildings
We use test areas and low-pressure methods on listed and conservation-area buildings.
Schools and care settings
We work in school holidays and INSET days, or behind exclusion zones away from pupils and residents.

We aim to reply to every survey request within one hour, 8am to 6pm, Monday to Saturday.

How it works

How it works

  1. 01

    Free site survey

    We survey within five working days, taking in the roofs by drone where airspace permits. Access planning covers central-street restrictions, delivery times and shared entrances; safety controls, including test areas on listed frontages, and the drainage from older roofs are recorded, then agreed with the facilities management lead.
  2. 02

    Fixed-price proposal

    What we'll do, when, and what's excluded. No day rates.
  3. 03

    Planning

    Site-specific RAMS issued. We check the asbestos register, drainage drawings and site rules before we start.
  4. 04

    The work

    Zone by zone behind barriers. Debris removed and wash water controlled.
  5. 05

    Completion report

    Completion report: before-and-after photography of each frontage and yard, with joints and repairs noted in the defect schedule, and sign-off at handover.
  6. 06

    Planned maintenance

    The report records the method used on each material and how the work was phased around the working day. An optional PPM schedule sets the ongoing maintenance and scope, and managed property cleaning for several Oxford buildings can follow one programme.

Photographic record

Survey, test area and completion report

Straight-down aerial view of apartment blocks, a paved courtyard and the surrounding roofs
Figure 01Survey: overhead aerial view of blocks and a paved courtyard in Oxford
Overhead aerial view of three metal-roofed apartment blocks around a block-paved courtyard
Figure 02Survey: aerial view of apartment blocks around a paved courtyard in Oxford
Block-paved walkway between brick buildings, with planting at the side and a few distant pedestrians
Figure 03Survey: paved communal walkway between buildings before cleaning in Oxford
A stained gutter and fascia with moss along it on a brick building, seen from below.
Survey: a stained, mossy gutter and fascia on a brick building

What we do

What the specification covers

A Oxford survey ends in a specification of works: what is cleaned, by which method, in what order, and what is excluded.

AreasHistoric-centre frontages, offices, shops, hotels, schools, care settings, managed blocks, and the business and industrial sites around the city.
MethodMethods follow the material, not a pressure setting, and the phasing follows the site: zones are coned off one at a time. Where a roof or gutter run is involved, the covering is identified and the asbestos register requested first.
OngoingWhere growth or traffic film keeps coming back, the completion report ends with a PPM proposal and a suggested review cycle, and planned preventative maintenance puts it on a fixed schedule of visits.

Questions

Common questions about Oxford sites

Can you work on listed buildings in central Oxford?

Yes. Listed and conservation-area buildings in central Oxford, from painted-render town houses to stone ashlar shop buildings, are specified elevation by elevation, with the method tried on a test area first. Chiltern Surface Co uses low-pressure methods on every one of these buildings.

Can the work be planned around a trading frontage in the centre?

Yes. Works are phased zone by zone behind agreed exclusion areas, so access can be maintained wherever the site conditions allow, and Chiltern Surface Co offers out-of-hours working where an Oxford frontage cannot close by day or the street is busy with pedestrians.

Can every stain be completely removed?

No. The achievable result depends on the depth and nature of the staining within the stone, brick or render. Where complete removal cannot be guaranteed on an Oxford building, Chiltern Surface Co identifies this before works begin and sets out the expected improvement clearly.

What do you send after the survey?

A fixed-price proposal for the Oxford site from Chiltern Surface Co, with a specification of works, programme and exclusions, and no day rates or overrun charges. When the work is done you receive a completion report: before-and-after photography, a defect schedule listing any cracked render, flaking paint or failed joints, and a PPM proposal.

What information should I provide?

The full address or postcode, the property type, the surfaces involved, photographs if you have them, any access or vehicle restrictions and your preferred timeframe. For roof or gutter work Chiltern Surface Co also asks for the site's asbestos register and drainage drawings before surveying the Oxford property.

Next step

Request a Site Survey

Tell us about the Oxford property, the areas that need attention, the result you want to achieve and whether the building is listed or in the central conservation area.

We aim to reply to every survey request within one hour, 8am to 6pm, Monday to Saturday.