Case study
Bucks · Oxon · Berks · Herts · SurreyBuckinghamshire · Oxfordshire · Berkshire · Hertfordshire · Surrey
National Film and Television School, Beaconsfield
Four days on a working school site: an 11-metre render façade soft washed from powered access, about 600 square metres of courtyard paving cleaned and treated, and the channel drains cleared.
We aim to reply to every survey request within one hour, 8am to 6pm, Monday to Saturday.
On siteThe east-facing façade, soft washed from powered access with the area below taped off.
- Free survey
- within five working days
- Reply within one hour
- we aim to, 8am to 6pm, Monday to Saturday
- 5-star rating
- on Google
- DBS-checked
- IPAF-accredited Chiltern Surface Co technicians
- £5m
- public liability insurance
Building and client
Building and client
The National Film and Television School in Beaconsfield, Buckinghamshire: a working school with students, staff and visitors on site. The east-facing elevation of its main building is about 11 metres high and 24 metres wide, in render panels, above a courtyard and walkways of concrete paving.
The problem
The problem
Algae, lichen and moss had established on the east-facing façade. The concrete paving, about 600 square metres of courtyard and walkways, carried black spot, moss, algae and ingrained dirt, and the channel drains at the foot of the building had silted up. The work had to fit around a site in use and the start of the new term.
What we did
What we did
Access method
The façade was soft washed from powered access set up in the car park, operated by our own IPAF-accredited Chiltern Surface Co technicians, with the area around the platform cordoned off throughout.
Days on site
Four: 12, 19 and 21 September and 2 October 2026.
How the site kept working
The paving was cleaned area by area, and each working area stayed cordoned off until it was safe to reopen. Two of the four days were Saturdays, when fewer students and staff were on site.
The scope
Render façade soft washed from powered access. Courtyard paving pressure washed, then treated for algae and moss. Channel drains cleared of silt.

Result
Result
The façade, about 600 square metres of paving and the channel drains were done in four days on site, between 12 September and 2 October.

- Office
- 01628 232 450
- Mobile
- 07308 755 755WhatsApp
We aim to reply to every survey request within one hour, 8am to 6pm, Monday to Saturday.
On site
On site



Next step
Request a Site Survey
Tell us about the site and what needs doing. We'll survey it free within five working days and send you a fixed price.
We aim to reply to every survey request within one hour, 8am to 6pm, Monday to Saturday.